Van 2 Build 0.0 The beginning
Van Build log. December 26th
Van Build 0.7
April 22nd progress, rear ceiling panels
Van Build 0.8
May 5th progress, read ceiling panels
Van Build 0.1
Van Build log. December 31st
Van Build 0.10
May 13th progress. Done with interior panelling.
Van2-11
June 10th progress. Done with interior panelling. Bed, bulkhead Done. Loo bench, table, mid pane
Van2-12
June 18th progress. Cabinets in, Countertops substrate done,
Van Build 0.2
Van Build log. March 08 back from the up fitters and lots of progress
Van Build 0.3
Van Build log. March 17th, upholstering
Van Build 0.4
March 31st, stil upholstery
Van Build 0.5
March 31st. Moar upholstery. Plus wall panels cut and prepped for upholstery
Van Build 0.6
April 3rd progress, let there be indirect light